City
Northern Virginia
Scope
Main-level renovation: interior wall removed to open the living area, new trimmed half wall with column at the stair, ceiling and drywall repaired, flooring patched in, crown and baseboard matched, full repaint
Year
2025
Duration
2–3 weeks
After · Jaber, 2–3 weeksThe brief
A wall split this main level into two smaller rooms. We took it out, repaired the ceiling and floor where it had stood, and finished the opening so it looks like the house was built that way.
A trimmed half wall with a column now marks the stair, crown and baseboard were matched to the existing profiles, and the whole level was repainted.