City
Northern Virginia
Scope
Full basement finish: framing, insulation, drywall, recessed lighting, wide-plank LVP flooring, six-panel doors, and a finished walkout entry
Budget
$50k–$90k
Duration
2–3 weeks


The brief
This basement started as a concrete shell with plastic-wrapped insulation and an air hockey table waiting for a real room. We framed and drywalled the full footprint, ran recessed lighting, and laid wide-plank LVP from one end to the walkout door. The air hockey table went right back where it stood — this time on a finished floor.
Spec / 01
#EFE8D8
Spec / 02
#C8B79E
Spec / 03
#A08A6E
Spec / 04
#F8F6F1
The work · 4 photos




More work in this area
Northern Virginia
wet-room shower · freestanding tub · matte black fixtures